    How hard is replacing stair treads and risers?

    My home is about 20 years old. When we moved in the basement was unfinished and the stairs were just paint grade pine. Many years later the downstairs is now finished but the stairs are still the same painted pine steps. I would like to install some new oak treads with white risers.

    I know I can do this but Iíve never done steps before. Any hints or tips?

  2. #2
    Join Date
    Oct 2006
    Location
    Florida
    Posts
    3,763
    Look up your local codes and make sure you adhere to them to prevent future problems. If you search this site, I believe other members have had some discussions about this, their posts may help you some. HTH
    I think in straight lines, but dream in curves

  3. #3
    Join Date
    Mar 2009
    Location
    westchester cnty, ny
    Posts
    1,142
    working on that now. i built walls and rooms around the existing stairs. in retrospect, i'd have rebuilt the stairs to. however, it's tool late for that. so i'm retrofitting the existing paint grade material open stringer stairs to look like a closed stringer oak tread and painted trim staircase. i'm using this product:

    http://youngmanufacturing.com/products/retrotread/

    it's a 5/8" solid wood product with an integrated scotia molding purchased @ lowes. HD has a similar product that includes a riser overlay, but the product is a veneer oak over mdf or plywood.

    i'm using 3/4" and 1/2" mdf for trim and 1/4" birch plywood for the riser overlays. the hardest part of the project will be fitting the riser and tread overlays for any angular inconsistencies at the edges and corners. my plan is to finish the treads before installation with 2 coats of wood floor grade polyurethane, then install them and finish with 3 coats of the same polyurethane thinned to a wiping consistency so the finish looks nice and air bubbles and dust nibs are minimized. lastly, paint all trim once the poly is completely dry. the platform at the base of the stairs will, like the basement floor, be carpeted. the pics are presented in no particular order.
    Attached Images Attached Images
    there's a solution to every problem.......you just have to be willing to find it.

  4. #4
    Join Date
    Mar 2009
    Location
    westchester cnty, ny
    Posts
    1,142
    here's one more pic that should demonstrate how the closed stringer look is being achieved.



    another 2-3 weeks part time and all should be done.
    there's a solution to every problem.......you just have to be willing to find it.

  5. #5
    Join Date
    May 2006
    Location
    Atlanta
    Posts
    156
    From the photos it looked like you had to cut off the bull-nosed end of the existing painted steps. Since you've done it, do you think it was easier to cut off the edge then add the RetroTread or would have removing and replacing the entire tread been just about the same work?

  6. #6
    Join Date
    Oct 2009
    Location
    Penn Hills, PA
    Posts
    297
    Quote Originally Posted by toolguy1000 View Post
    the hardest part of the project will be fitting the riser and tread overlays for any angular inconsistencies at the edges and corners.
    You know how to do that, right?

    With a piece of scrap a couple feet long, and about the width of the tread or riser you're installing, push it into the corner as snug as it will go (any deviation from 90 at the wall will show up as a gap at the front/back or top/bottom here).

    Now scribe a line using the wall or stretcher as your guide, and take the scrap over to the miter saw. Adjust the saw so the blade cuts perfectly to your scribed line. Test your piece of scrap to make sure the cut fits perfectly (no gaps). [After you have done one or two, you won't need to keep testing.]

    Finally, once you're convinced the scrap fits nicely, use the perfectly adjusted miter saw to cut the real tread or riser.

    Goes pretty fast once you get the hang of it.

  7. #7
    Join Date
    Feb 2003
    Location
    Lexington, SC.
    Posts
    3,919
    I've done two of these stair cases, one in my former house (in Pittsburgh PA) and another in the home I am in now. For my current house, the treads were not construction lumber, they were southern yellow pine but shaped exactly like an oak tread. I sanded them smooth and pickled them. The cabinets in the basement (where this staircase leads you) are white melamine with pickled pine doors. So it fits, at least to me.

    The other staircase was the first to second floor staircase in our Pittsburgh PA house. The carpet in the upstairs hallway got to looking terrible so I bought some Launstein flooring and put it in the hallway upstairs. Then I got to thinking about the staircase. I cut the construction lumber treads down flush with the riser, put the 3/8 solid oak flooring over the tread, and put a bullnose molding piece I made with a groove on the back to fit the molding on. I cut a groove in the stringers on both ends so I could slide the flooring into the stringer a little to hide the joint. It was laborous but the cost was pretty reasonable. I also made up an oak cove molding I put between the riser and bottom of each tread (to help hide that joint).

    The risers in both cases were the rough constrution plywood spackled and painted.

    The Pittsburgh PA staircase helped sell the house. I also added an oak post and handrail.

    Jim

  8. #8
    Join Date
    Mar 2009
    Location
    westchester cnty, ny
    Posts
    1,142
    Quote Originally Posted by Woodshark View Post
    From the photos it looked like you had to cut off the bull-nosed end of the existing painted steps. Since you've done it, do you think it was easier to cut off the edge then add the RetroTread or would have removing and replacing the entire tread been just about the same work?
    yes, had i thought about it before i built a non-structural wall on the stair treads. that rendered the existing stair treads captive. i didn't want to try to flush cut them where the wall sat atop each tread and risk damaging the walls. removing the bullnose edging was realatively easy with a jig saw and a multi tool.
    Last edited by toolguy1000; 02-27-2012 at 04:18 PM.
    there's a solution to every problem.......you just have to be willing to find it.

  9. #9
    Join Date
    Mar 2009
    Location
    westchester cnty, ny
    Posts
    1,142
    Quote Originally Posted by All Thumbs View Post
    You know how to do that, right?

    With a piece of scrap a couple feet long, and about the width of the tread or riser you're installing, push it into the corner as snug as it will go (any deviation from 90 at the wall will show up as a gap at the front/back or top/bottom here).

    Now scribe a line using the wall or stretcher as your guide, and take the scrap over to the miter saw. Adjust the saw so the blade cuts perfectly to your scribed line. Test your piece of scrap to make sure the cut fits perfectly (no gaps). [After you have done one or two, you won't need to keep testing.]

    Finally, once you're convinced the scrap fits nicely, use the perfectly adjusted miter saw to cut the real tread or riser.

    Goes pretty fast once you get the hang of it. although they use an aluminum edged jig to establish the size of each tread and riser
    that's exactly how the manufacturer's instructions say to do it, although they use an aluminum edged jig to establish the size of each tread and riser.
    there's a solution to every problem.......you just have to be willing to find it.

  10. #10
    Join Date
    May 2006
    Location
    Atlanta
    Posts
    156
    Well I prefinished the oak stair treads and a 1/4" sheet of oak ply for overlaying the risers. I thought that I could easily remove the existing pine treads but whoever installed them 20 years ago used about a 1/2 tube of construction adhesive per tread. Looks like I will have to rip out both the tread and the 2x base and rebuild from there. Hope I don't damage the stringers in the process.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •